Trolley furnace heat treatment furnace operation process
Check whether the AC220V power supply is normal; open the gas pipe manual valve and safety valve, check whether the gas pipe outlet pressure (6~8KPa) is normal; check whether the furnace pressure display value is at the "OPa position".Vacuum brazing in automotive heat exchangers On the host computer, set the smoke valve to "manual" and set the smoke valve position to ~60%. Set the air valve to "manual" on the host computer, adjust the air valve position to 20%~30%, and start the fan. Check whether the wind pressure is normal (4~6KPa) and then set the wind pressure control to the "automatic" position.Application of sintering technology in semiconductors Open the gas main manual gate valve, then open the gas emergency shut-off valve, and then open each relief valve until the pipeline gas inspection passes and then close the relief valve.Optimizing vacuum heat treatment of spring steel ①. Set each HSK-B burner manipulator on site to the "local" position and turn on the power. ②. Press the "Start" button to turn on the small wind blowing. ③. Then set the controller to the "System" file.Heat treatment process for wide and thick plates
评论
发表评论